Control Panel Assembly – HKN/WAZ Substation, Netherlands (2023)

HKN/WAZ TENNET

Substation Control Panel Installation

Client: BRAVE WORK | Location: Wijk aan Zee, Netherlands | Period: 2023 The assignment included configuring, assembling, and verifying the operation of high-voltage control panels to meet European electrical standards.
  • Electrical panel configuration and component tuning for operational readiness.
  • Troubleshooting and correcting pre-energization errors to meet compliance.
  • Assisting in commissioning tests and continuity validation.

Request a Free Consultation

Our team of specialists is ready to assist you with cutting-edge electrical, automation, and industrial solutions. Contact us to discuss your needs and find the best approach for your projects.

Get a Free Consultation