
Control Panel Assembly – HKN/WAZ Substation, Netherlands (2023)
HKN/WAZ TENNET
Substation Control Panel Installation
Client: BRAVE WORK | Location: Wijk aan Zee, Netherlands | Period: 2023 The assignment included configuring, assembling, and verifying the operation of high-voltage control panels to meet European electrical standards.- Electrical panel configuration and component tuning for operational readiness.
- Troubleshooting and correcting pre-energization errors to meet compliance.
- Assisting in commissioning tests and continuity validation.




Request a Free Consultation
Our team of specialists is ready to assist you with cutting-edge electrical, automation, and industrial solutions. Contact us to discuss your needs and find the best approach for your projects.